{"id":31647,"date":"2026-03-06T10:38:07","date_gmt":"2026-03-06T09:38:07","guid":{"rendered":"https:\/\/www.8p2.fr\/?p=31647"},"modified":"2026-03-25T09:42:00","modified_gmt":"2026-03-25T08:42:00","slug":"due-diligence-technique-pour-1-projet-eolien-2","status":"publish","type":"post","link":"https:\/\/www.8p2.fr\/en\/due-diligence-technique-pour-1-projet-eolien-2\/","title":{"rendered":"Technical Due Diligence for 1 Wind Project"},"content":{"rendered":"<p class=\"has-luminous-vivid-amber-color has-text-color has-link-color has-medium-font-size wp-elements-09ca353d629da526e7fd8918dde44967\" style=\"font-style:normal;font-weight:700\"><strong>February 2026<\/strong><\/p>\n\n\n\n<p class=\"has-medium-font-size\"><b><strong><strong><strong><strong><strong>Detailed technical review of a 41 MW WTG project under development in France<\/strong><\/strong><\/strong><\/strong><\/strong><\/b><\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading has-luminous-vivid-amber-color has-text-color has-link-color wp-elements-f3282e12d16f1386277346ccf57be4e9\" style=\"font-style:normal;font-weight:700;text-transform:uppercase\">Project Context<\/h2>\n\n\n\n<p style=\"font-style:normal;font-weight:400\"><strong>The client<\/strong> selected <strong>8.2 Advisory <\/strong>as a technical due diligence advisor as part of an <strong>acquisition process<\/strong>. 8.2 Advisory provided support with the objective of obtaining an independent and critical assessment of the project. The purpose of the report was to identify, at an early stage, the main issues that could negatively impact the bankability of the projects.<\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading has-luminous-vivid-amber-color has-text-color has-link-color has-medium-font-size wp-elements-0f181a2ee6029755adf4802d31d25ee9\" style=\"font-style:normal;font-weight:700;text-transform:uppercase\">Scope of Work<\/h2>\n\n\n\n<p style=\"font-style:normal;font-weight:400\">8.2 Advisory provided the Client with a detailed TDD including:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li style=\"font-style:normal;font-weight:400\"><strong>Permitting review<\/strong><\/li>\n\n\n\n<li style=\"font-style:normal;font-weight:400\">Review of the <strong>design<\/strong><\/li>\n\n\n\n<li style=\"font-style:normal;font-weight:400\">O&amp;M <strong>contracts<\/strong> review : EPC and TSIA contracts (including construction time schedule)<\/li>\n\n\n\n<li style=\"font-style:normal;font-weight:400\">Grid <strong>connection<\/strong> agreement review (characteristics, issues, constraints and limitations)<\/li>\n\n\n\n<li style=\"font-style:normal;font-weight:400\">O&amp;M <strong>contracts<\/strong> review : WTG, Substation, TCMA and Aggregation contracts<\/li>\n\n\n\n<li style=\"font-style:normal;font-weight:400\">Existing<strong>energy yield assessment review <\/strong>(yield analysis, curtailments, power factor)<\/li>\n\n\n\n<li style=\"font-style:normal;font-weight:400\">Review of the technical inputs data for the <strong>financial model <\/strong>(Capex and Opex);<\/li>\n\n\n\n<li style=\"font-style:normal;font-weight:400\"><strong>Stakeholder analysis <\/strong>(ENERTRAG, Turbine manufacturer, EDF, Aggregator)<\/li>\n<\/ul>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p><b>February 2026<\/b><br \/>\nDetailed technical review of a 41 MW WTG project under development in France<\/p>","protected":false},"author":2,"featured_media":31644,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[22],"tags":[],"class_list":["post-31647","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-case-study"],"jetpack_featured_media_url":"https:\/\/www.8p2.fr\/wp-content\/uploads\/2026\/03\/3619870.jpeg","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www.8p2.fr\/en\/wp-json\/wp\/v2\/posts\/31647","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.8p2.fr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.8p2.fr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.8p2.fr\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.8p2.fr\/en\/wp-json\/wp\/v2\/comments?post=31647"}],"version-history":[{"count":4,"href":"https:\/\/www.8p2.fr\/en\/wp-json\/wp\/v2\/posts\/31647\/revisions"}],"predecessor-version":[{"id":31688,"href":"https:\/\/www.8p2.fr\/en\/wp-json\/wp\/v2\/posts\/31647\/revisions\/31688"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.8p2.fr\/en\/wp-json\/wp\/v2\/media\/31644"}],"wp:attachment":[{"href":"https:\/\/www.8p2.fr\/en\/wp-json\/wp\/v2\/media?parent=31647"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.8p2.fr\/en\/wp-json\/wp\/v2\/categories?post=31647"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.8p2.fr\/en\/wp-json\/wp\/v2\/tags?post=31647"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}