4, rue du Tri Postal - 33800 BORDEAUX

Energy Yield Assessment for 1 Wind Project

Bankable energy yield assessment for a 15 MW WTG project under development in France


Our Client selected 8.2 Advisory as technical due diligence advisor during their development process.8.2 Advisory performed a comprehensive bankable yield assessment to review the technical viability of the 15 MW wind farm in France.

8.2 Advisory provided VSB with a detailed yield assessment including:

  • Long-term wind resource assessment (wind speed and direction analysis)
  • Site and terrain modelling, including wake and topographical effects
  • Inclusion of external wake effect from neighbouring wind farms
  • Energy yield modelling assumptions and loss breakdown (availability, electrical, environmental, wake losses, etc.)
  • Incorporation of acoustic and bat curtailment losses
  • Uncertainty analysis
  • Breakdown of production and losses per turbine
  • 10 and 20-year P50, P75 and P90 net energy yield assessments

Other case studies

en_GB