4, rue du Tri Postal - 33800 BORDEAUX

Owner’s Engineering for 1 Solar PV project

Obsolescence study for a 24,3 MWp solar PV plant in the South of France


The client selected 8.2 Advisory to carry out a technical analysis assessing strategies to mitigate the ageing of a 24.3 MWp ground-mounted solar plant. The assignment focused on reviewing the conditions and available options for replacing photovoltaic modules at the site.

8.2 Advisory provided the Client with a detailed report, including:

  • An electrical and mechanical review of potential replacement modules
  • Strategies for the procurement of the chosen replacement modules
  • An analysis of potential mismatch losses with different replacement module strategies
  • Operational considerations to ensure :
  • Minimal production loss during the equipment replacements
  • Sufficient stock of all modules (existing & new) would remain for the future lifetime of the plant
  • Validation of a replacement module to alleviate the obsolescence risk
  • Definition of a procurement strategy to ensure the optimal quantity of modules
  • Definition of an optimal replacement strategy to avoid mixing new and existing modules
  • Accompanying during the installation phase to ensure the plan is operated correctly
  • Yield assessment of the future installation for budgeting purposes
  • Performance analysis of the site before and after the module replacement, to ensure modules are performed as planned

Other case studies

en_GB